If your order is showing the status as Quality Control Queue 1 or Quality Control Queue 2 then your machine is in the final stage and have a final inspection. You should expect your PC to be shipped within 48 hours of your order going to this status level.
During this stage the following is completed.
1) Final power up 2) Specification double checked 3) All accessories are picked 4) All spare cds, screws, cables are checked and packed 5) Custom requests such as raid and partitions are checked 6) General system checks such as doors opening, cd drive, locks opening, closing etc 7) Final dust down 8) Order is prepared to be packed up for the final dispatch stage. Once this stage is completed you will be emailed and the status will change to Dispatch Queue.
Last update: 11:02 AM Monday, May 24, 2010
|